2017 GULFSTREAM G650ER

SERIAL NUMBER 6235

HIGHLIGHTS

  • Will Deliver with 8C Inspection Completed
  • 15 Passenger Configuration
  • One Owner Since New
  • Professionally Managed
  • Always Hangared
  • Low Hours & Cycles
  • Engines on Rolls Royce Corporate Care Enhanced
  • APU on Honeywell MSP
  • Part 135 Certified

AIRFRAME

Certificate of Airworthiness:April 2017
Entry Into Service:April 2017
Certification:Part 135
Total Time Since New:1,142 Hours
Total Landings Since New:545
(as of January 2025)
Maintenance Tracking:Gulfstream CMP

ENGINES

Manufacturer:Rolls Royce
Model:BR700-725A1-12
ENGINE 1 (LEFT)ENGINE 2 (RIGHT)
Serial Number:2557925578
Total Time Since New:1,142 Hours1,142 Hours
Total Cycles Since New:545 Hours545 Hours
Program Coverage:Enrolled on Rolls Royce Corporate Care Enhanced

APU

Manufacturer:Honeywell
Model:RE220 [GVI]
Serial Number:P-351
Total Time Since New:1,392 Hours
Program Coverage:Enrolled on Honeywell MSP

AVIONICS

TYPE OF UNITQUANTITYDESCRIPTION
EFIS (Electronic Flight Instrument System)1Consists of 4 DU, 2 SMCs (shared with EICAS), 1 dimming panel (shared with EICAS), 1 display system reversionary panel (shared with EICAS)
FMS (Flight Management System)3Honeywell ASCA Inc., 7038231-1902
DU (Display Unit)4Honeywell International Inc, 7028140 (PFDs, 2 MFDs)
IRS (Inertial Reference System)3Honeywell International Inc, HG2100BB02
AIOP (Autopilot)4Honeywell ASCA Inc., 7028432-1902
ADS (Air Data Systems)4Rosemount Aerospace Inc., 2015G2H2CLL-2, 2015G2H2CLU-2, 2015G2H2CRL-2, 2015G2H2CRU-2
GPS (Global Positioning System)2Honeywell ASCA Inc., 7026208-805
DME (Distance Measuring Equipment)2Honeywell International, 7510184-855
HUD II (Head Up Display)1Rockwell Collins, Inc., 1500-3060-001
EVS (Enhanced Vision System)1Kalman Inc, 48539-101
ADF (Automatic Direction Finder)1Honeywell International, 7510114-855
VHF COM (Very High Freq. Communications)2Honeywell International, 7026201-813
NAV Radio System1Honeywell ASCA Inc., 7026203-813
HF COM (High Freq. Communications)2Rockwell Collins Electromechanical Systems, Inc., 822-0102-001
SATCOM (Satellite Communications)1Honeywell, 1252-A-3800-01
WRADAR (Weather Radar)1Honeywell ASCA Inc., 930-2000-001
RADIO ALT (Radio Altimeter)2Honeywell ASCA Inc., 066-01153-0101
XPNDR (Transponder)2Aviation Communication & Surveillance, 7517402-970
EGPWS (Enhanced Ground Proximity2Honeywell ASCA Inc., 7034056-1903, 7027208-1903
TCAS (Traffic Collision Avoidance System)1Honeywell ASCA Inc., 9003500-55905
CVR (Cockpit Voice Recorder)1Universal Avionics Systems Corp., 1606-01-00
FDR (Flight Data Recorder)1Universal Avionics Systems Corp., 1607-00-00
ELT (Emergency Locator Transmitter)1ACR Electronics, Inc., 453-5060

ADDITIONAL EQUIPMENT

  • Synthetic Vision-Primary Flight Display (SV-PFD)
  • ASC 005A Runway Awareness Advisory System (RAAS)
  • ASC 038A PlaneView Avionics Enhancements
  • ASC 100 PlaneView Avionics Enhancements
  • TCAS 7.1
  • ADS-B Out v2 (DO-260B)
  • Future Air Navigation System (FANS-1/A+) CPDLC
  • Wide Area Aug. System (WAAS) w/ LPV Approaches

INTERIOR

Capacity:15 Passenger Seats Certified for Taxi, Take Off and Landing
Zone 1:Four (4) Club Seats
Zone 2:Two (2) Forward-Facing Club Seats, followed by Two (2) Club Seats opposite Three (3) Place Divan (berthable)
Zone 3:Four (4) Place Conference Group opposite Credenza
Galley:Aft
Lavatories:Forward Crew & Aft Guest
MATERIALS
Seats:Classic Cowhide Bavarian Cream
Wood:Fig Dark Eucalyptus
Divan Fabric:Cariani Canaletto
Headliner:Ultraleather Cream
Carpet:Herald Wool

EXTERIOR

Base Paint Colour:Matterhorn White
Stripe Colours:Oak Brown, Carter Gold, CS Platinum 2, Gray

MAJOR INSPECTION STATUS

INSPECTIONLAST PERFORMEDNEXT DUE
1C / 12 Month30th March 2024In Progress
2C / 24 Month30th March 2023In Progress
3C / 36 Month30th March 202309th March 2026
4C / 48 Month23rd May 2021In Progress
8C / 96 MonthIn Progress

ENTERTAINMENT & COMMUNICATION

Display(s) / TV Monitor(s):One (1) TV Monitor
Airshow System:Enable via CabinView Flight Information System
Cabin Management System:Enable via CabinView Flight Information System

WARRANTIES REMAINING

  • GAC Production Structure (L & M) until 29th March 2037
  • GAC Rolls Royce Nacelle until 29th March 2037

FLOORPLAN